Industry · Lauenburg
Worlée Chemie: production tower refurbishment
Chemical site on the Elbe: detailed ventilation engineering for the refurbishment of the production tower.
- Location
- Lauenburg
- Period
- 2025
- Work stages
- LP 3
- Status
- Completed
- Client
- WISAG AG
- MEP volume
- 20 Mio. EUR
Project description
Worlée Chemie: production tower refurbishment, Lauenburg
For the refurbishment of the production tower at Worlée Chemie in Lauenburg we detailed the ventilation systems. Process exhaust, supply air routing and explosion protection in a chemical production plant placed high demands on routing and equipment.
Detailing was model-based and closely coordinated with structure, fire protection and process engineering. Work stage 3 was completed in 2025.